Other Blogs

Friday 2 June 2017

John Wright | Wentworth Castle

Wentworth Castle, New Visitor & Conservatory Reconstruction in Wentworth

Main Contractor : William Anelay Ltd
Client: Wentworth Castle Trust

Type: Specified
Procurement: Tendered and Negotiated
Location: Wentworth, South Yorkshire


Project Value: £240,000




The Project

This project involved the building of a new visitor centre attached to the existing Victorian conservatory and the refurbishment of the existing conservatory.

The Solution

The works involved carrying out the main electrical and mechanical services including rainwater harvesting, under floor heating, etc.

The difficulty with this project was bringing the new visitor centre together with the conservatory in aspects of lighting, heating etc. The heating within the conservatory was carried out utilising gilled tube heating around the perimeter and within the existing floor ducting. The main visitor centre utilised under floor heating with main condensing system boilers within the plant room.

The new roof on the visitor centre had a seeded roof irrigation system installed as part of the works to assist with the carbon footprint of the building.

The rainwater harvesting system installed utilised both new and existing underground water tanks to feed the new toilet facilities within the new visitor centre.

The scheme required a complex BMS (Building Management System) along with pulsed metering to enable conformity with Breeam regulations.

The lighting has been carried out using various different lighting manufactures to offer an aesthetically pleasing solution to the end users of the building. This included the use of LED and dimmable controls with a central static invertor being used for the emergency lighting.

Other elements of our works involved with this project were Mains distribution, data, fire alarm, General power, Hot water services, mains Gas services and intruder alarm to offer the client a total end solution.

Wednesday 24 May 2017

Clifton Park, Mechanical and Electrical Contractors in York

Clifton Park, Mechanical and Electrical Contractors in York


Main Contractor : Mansell (Balfour Beatty)
Client: NHS Property Services

Type: Specified
Procurement: Tendered and Negotiated
Location: York, North Yorkshire

Project Value: £1,200,00.00



The Project


This project is a new build which John Wright Electrical Mechanical and Electrical Contractors of York, were delighted to take on. It involves the supply, installation, testing and commissioning of all M & E packages to provide a new 22 bed Women’s Low Secure Unit ( WLSU ) along with administration support.

The Solution

The systems have been installed to provide security, comfort and peace of mind to both patients and staff. This is afforded due to the complex safety systems being installed including the very latest in panic alarm systems and fingerprint technology to the door access systems.

The heating has been designed and installed utilising the latest in ceiling mounted panel heaters to provide heating to the bedrooms and circulation areas. These were supplied by 2 No dual fuel Viessmann 225kw boilers along with associated BMS controls.

Sanitary ware has been installed utilising specialist equipment due to the anti-ligature nature of the use of the building with automatic controls to the sinks, toilets and shower units.

Ventilation has been afforded by the use of Various AHU’s and independent local extract fans.

TThe mains services already on site meant that a new 372m run of 180mm MDPE Gas pipe was installed along with 90mm MDPE water service and associated along with monitored metering back to the main BMS systems.

A new BMS system has been installed to control and monitor heating, hot water, gas, Generator, lift, fire alarm and window systems.

New Electrical distribution has been installed utilising both essential and non essential supplies via means of a new 130KVA generator back up system installed to the new panel board. Local distribution via sub main cabling and local distribution boards have been installed throughout the new build.

Lighting has been installed utilising both Anti ligature fittings to the bedroom areas and a combination of HF fluorescent and LED fittings to communal / administration areas

New fibre optic and Cat6 cabling has been installed by ourselves to accommodate the new data and Wi-Fi and CCTV systems back to the existing building within Clifton House.

Other systems installed as part of the works include :-

General small power, Lighting / emergency lighting, Staff alarm system. CCTV, Door access, TV installation.


Wednesday 29 March 2017

John Wright | National Mechanical Small Works Contractors

National Mechanical Small Works Contractors
Support for your smaller works ensure that your business developments can be handled smoothly, efficiently and economically.
Many of our maintenance contracts started with small works, be it a new School or Hospital or domestic Boiler
.

Client Partnerships with..

Askham Bryan College
Queen Margarets School
The Mount School
Bootham School
Grimsby Hospital
Ministry Of Defence

Operating within the retail, commercial, domestic and industrial markets we are able to deliver our services promptly with our own experienced, permanent team of management, Plumbers and H&V engineers.

Our portfolio of clients is varied from large facilities management organisations, to the home owner, delivering small works mechanical support for large commercial sites to the installation of a Boiler in your home. 


As members of CHAS, Construction Line, NICEIC, Gas Safe, OFTEC and HVCA you can be assured of the highest standards in every aspect of our work.


We also have a team of test engineers that can carry out all kinds of testing including:


  • PAT Testing
  • Electrical Condition Reports
  • Completion Certificates
  • Fire Alarm Testing & Certification

  • Emergency Lighting Testing & Certification
  • Landlords Gas Safety Certification
  • Boiler Servicing

Friday 17 February 2017

John Wright Electrical | Whitby Abbey Visitor Centre, North Yorkshire

Whitby Abbey Visitor Centre, North Yorkshire

Main Contractor: William Birch & Sons Ltd
Client: English Heritage
Type: Specified
Procurement: Tendered and Negotiated
Location: Whitby, North Yorkshire
Project Value: £136,000


The Project

This was a very challenging project, the client, English heritage have a responsibility to take care of the existing structures which involved designing the electrical services around the existing structure to enhance the building.

The Solution

We utilised a stainless steel floor trunking and steel conduit systems to supply general power / data throughout the building for the retail area.

The lighting was designed to enhance the oak latted ceilings with recessed high level lighting general / emergency and feature lighting.

Other services within the building included Lightning Protection utilising the building structure and foundations, CCTV, fire alarm installation and intruder alarms as well as the heating controls.

We also had the responsibility of installing the external lighting to the Abbey itself to enhance its mystery and features. As this is located on the headland it could be seen for miles around so obtaining the correct lamp colour to enhance the stonework was the critical part of this installation. We used a combination of both Metal halide AND Son lamps to achieve this.


Friday 27 January 2017

John Wright Electrical | Malton Community Sports Centre in Malton, North Yorkshire

Malton Community Sports Centre in Malton, North Yorkshire

Main Contractor: William Birch & Sons Ltd
Client: Malton School
Type: Specified
Procurement: Tendered and Negotiated
Location: Malton, North Yorkshire
Project Value: £141,000





The Project

John Wright were appointed as Yorkshire Electrical Contractors to undertake major electrical contract work for William Birch and Son for a new design and build Sports Centre, Malton, Yorkshire.

The project was to provide an indoor sports facility along with changing facilities and an outdoor Multi Use Games Area (MUGA) pitch for both the school and also for local residents.

The Solution

We provided all the electrical contract services.

Power, General lighting, CCTV, Intruder and Fire Alarm Systems, Disabled Alarm, PA System and induction hearing loops along with a New Data System. Lighting to the MUGA pitch was carried out utilising Abacus raise / lower columns for ease of maintenance.

New electric mains were run from the main school to new distribution equipment within the sports hall plant room, with supplies taken to feed the external MUGA pitch lighting.

General and Emergency lighting was designed and installed to achieve economic and cost effective yet energy efficient, to achieve Breeam requirements.

The Fire Alarm was linked back to the school’s system to show fire, fault signals along with the digital CCTV system. This was installed using fibre optic cabling linked back to the main school.

The MUGA pitch lighting required special consideration and design due to the bats living in the local vicinity. This was achieved by the use of specially designed reflectors installed and manufactured within the fittings to avoid light spillage away from the local hedge rows.

Project completed on time and on budget.



Wednesday 21 December 2016

John Wright Electrical | National Mechanical Engineering Contractors

National Mechanical Engineering Contractors

Major Mechanical Installations throughout the UK, creating seamless M&E solutions for professional businesses, Schools, Hospitals, Colleges and Universities.

Client Partnerships with..
Shepherd Construction
WM Birch & Sons Ltd
English Heritage
University of York
Morgan Sindal
GB Building Solutions
Leeds and York NHS Trusts
York College
Scarborough NHS Trusts
Askham Bryan College
City of York Council
From small projects to large projects in excess of £1million, we can provide the full range of mechanical building solutions for our clients in both private and public sectors.

From a boiler house refurbishment to large mechanical commercial / industrial installations we have the in house capability to design and install your requirements, ontime and on budget.

Because we are specialists in both electrical & mechanical design and installations and are located within one head office, our design engineers work closely together to ensure no overlaps in disciplines occur, as this often happens with separate companies.

Our design facility is backed up with full industry design software including the latest in AutoCAD to enable our designers to offer the most effective and sustainable systems to our clients.

We operate a small works department within the mechanical division that specialises in both planned maintenance and responsive works. This is to ensure that our clients have as little down time as possible when an event occurs.

All the below works are backed by our accreditations with HVCA, OFTEC and Gas Safe.

Wednesday 30 November 2016

John Wright | Green Energies


Green Energies

At John Wright Electrical & Mechanical Services Ltd (JWEMS Ltd) we design, install & maintain various types of green energy to meet the ever increasing demands on achieving BREEAM excellent standards for new building and conversion of existing plant and buildings.

For further information on this service please use our Contact Us or to view our other services please visit our website


Social Media Managed By Multi Web Services